    Convert a Furnace to a Heat Pump

    Compare a full ducted conversion, a dual-fuel design, and ductless or mixed options using the home's actual load, ducts, electrical capacity, backup strategy and complete written scope.

    Call (516) 259-1191
    Full or dual-fuelWritten project scopeCurrent program review

    Start with the building—not a package

    A useful conversion proposal answers five questions

    1. 1. What are the heating and cooling loads?
    2. 2. Can the ducts deliver the selected system's airflow?
    3. 3. What electrical and backup-heat load is required?
    4. 4. What existing equipment, fuel and venting work is included?
    5. 5. Which price, program and schedule assumptions are written?
    Google 5/5 (94 reviews)

    Three project paths

    Compare complete designs, not slogans

    These paths solve different building and homeowner constraints. None should be selected from square footage or fuel type alone.

    Full ducted conversion

    Replace the furnace and existing cooling equipment with a matched heat-pump outdoor unit and air handler when the duct system, electrical service, drainage and equipment locations support the design.

    Ask: Which exact indoor/outdoor match, low-temperature capacity and backup-heat strategy are proposed?

    Dual-fuel conversion

    Keep or install a compatible furnace as backup and pair it with a heat pump, matched coil and controls. The proposal should state the switchover logic and which equipment runs under each condition.

    Ask: What controls the balance point, and how will fuel and electric rates influence that setting?

    Ductless or mixed design

    Use ductless zones, or combine central and ductless equipment, where existing ducts cannot serve the heating load or particular rooms without disproportionate reconstruction.

    Ask: Which rooms does each zone serve, where do line sets and drains run, and what existing heat remains?

    Conversion assessment

    Six systems have to work together

    A heat pump is not a drop-in furnace when airflow, electrical demand, controls or low-temperature capacity are ignored.

    Heating and cooling loads

    Document the design temperatures, room or zone loads, selected capacity and the equipment performance used at cold outdoor conditions.

    Duct and airflow condition

    Check supply and return capacity, static pressure, leakage, filtration and whether existing ducts can deliver the required airflow without unacceptable noise.

    Electrical capacity

    Identify required circuits, disconnects, panel or service limitations, electric backup heat and responsibility for electrical work before equipment is ordered.

    Backup and controls

    State whether the design is all-electric, dual-fuel or retains another heat source, and document thermostat, lockout and emergency-heat behavior.

    Removal and other trades

    Clarify furnace, vent, chimney, fuel-line or oil-tank work; condensate, penetrations and restoration; and which items require another qualified trade.

    Permits and program rules

    Assign permit, inspection, closeout and incentive-document responsibilities. Do not subtract a program amount until the customer, equipment and project are confirmed eligible.

    Cost and savings analysis

    Use actual bills and explicit assumptions

    A percentage-savings promise is not a substitute for comparing the home's current energy use with a defined heat-pump design. Ask for every assumption that drives the estimate.

    • The home's actual 12-month fuel and electric usage—not square footage alone
    • Current utility tariff, delivery charges and the fuel price being replaced
    • Heating load, equipment capacity and efficiency at relevant outdoor temperatures
    • Backup heat type, control settings and expected backup-energy use
    • Cooling equipment being replaced or avoided as part of the same project
    • Maintenance, tank, chimney or other costs that truly disappear after conversion

    Price the base project before incentives

    The written proposal should show the complete installed price before any utility or manufacturer amount. Then list each possible incentive separately with the program, eligibility assumptions, responsible party and payment timing.

    2026 federal note: IRS instructions state that the Energy Efficient Home Improvement Credit cannot be claimed for property placed in service after December 31, 2025.
    Read IRS Form 5695 instructions

    Current program reality

    PSEG Long Island publishes 2026 rules—but eligibility is project-specific

    The 2026 Home Comfort announcement includes updated income tiers, sizing rules, equipment restrictions and caps. Current payment depends on the customer, participating contractor, equipment, sizing, installation and documentation. Program terms can change.

    Confirm before purchase

    • Customer and address eligibility
    • Participating-contractor requirement
    • Exact matched equipment eligibility
    • Load and sizing compliance
    • Required pre-approval and documentation
    • Estimated amount and who receives it

    What a comparable proposal should contain

    Use this list to normalize bids. A lower equipment price may not include the same ducts, electrical work, removal, program work, permits or coverage.

    Review financing separately from project price
    Load assumptions and the sizing method used
    Exact matched equipment, AHRI or program identifiers when applicable
    Capacity and efficiency data at relevant outdoor temperatures
    Duct, airflow, filtration, drainage and controls scope
    Electrical circuits, panel/service work and backup-heat demand
    Removal, fuel, venting, tank, chimney and restoration responsibilities
    Permit, inspection and program-submission responsibilities
    Total price before incentives, exclusions, change-order terms and anticipated schedule
    Manufacturer and labor coverage terms plus registration responsibility

    Project sequence

    From assessment to documented startup

    1. 1. Survey the home and existing systems

      Review the furnace, cooling system, ducts, electrical service, fuel equipment, drainage, building conditions and the homeowner's comfort goals.

    2. 2. Compare complete system paths

      Evaluate full-conversion, dual-fuel and ductless or mixed designs where relevant. Compare the complete installed scope rather than equipment price alone.

    3. 3. Normalize cost and operating assumptions

      Use actual utility history and written rate, load, performance and backup assumptions. Keep unconfirmed rebates outside the base project price.

    4. 4. Authorize a documented proposal

      Confirm equipment, responsibilities, exclusions, price, program assumptions, schedule and coverage terms before ordering or removing the existing heat source.

    5. 5. Install, commission and retain records

      Complete the authorized work, verify airflow and controls, review operation, and retain startup records, permits, manuals, registrations and program documents.

    Reviewed local conversion pages

    These local pages have reviewed service and city content. Address coverage and appointment timing are still confirmed by dispatch.

    Furnace-to-Heat-Pump Conversion FAQs

    Can an existing furnace be replaced with a central heat pump?

    Often, when the home has a practical equipment location and the ducts, electrical service, drainage and controls can support the selected system. The design still needs a heating and cooling load calculation plus equipment performance at relevant outdoor temperatures. Existing furnace size is not a reliable heat-pump sizing rule.

    Should I remove the furnace or keep it for dual-fuel backup?

    That decision depends on the home's load, selected heat-pump capacity, ductwork, electrical limits, fuel and electric rates, comfort priorities and the homeowner's tolerance for backup strategies. Compare an all-electric design and a compatible dual-fuel design on the same written scope before deciding.

    How much does a furnace-to-heat-pump conversion cost in Nassau County?

    A responsible price requires a site assessment. Equipment capacity and efficiency, duct modifications, electrical work, backup heat, controls, removal, fuel or venting work, drainage, permits, access and restoration all affect the total. Ask for the base project price before any unconfirmed incentive is subtracted.

    Are PSEG Long Island heat-pump rebates available in 2026?

    PSEG Long Island publishes a 2026 Home Comfort program, but eligibility depends on the current program, customer, contractor, equipment, sizing, installation and documentation rules. Payment also remains subject to the program's approval and terms. Confirm the address, selected system and estimated amount in writing before purchase.

    Is the federal 25C heat-pump tax credit available for a 2026 installation?

    No. Current IRS Form 5695 instructions state that the Energy Efficient Home Improvement Credit cannot be claimed for property placed in service after December 31, 2025. Home+ does not subtract that expired federal credit from a 2026 proposal.

    How long does a conversion take?

    There is no universal duration. Equipment availability, duct and electrical work, removal scope, permits, inspections, fuel or tank work, restoration and other trades determine the sequence. The written proposal should state the anticipated schedule and identify dependencies before work begins.

    Ready to compare conversion options?

    Request an assessment or call to confirm current Nassau County coverage, scheduling and equipment capability.